[[["Easy to understand","easyToUnderstand","thumb-up"],["Solved my problem","solvedMyProblem","thumb-up"],["Other","otherUp","thumb-up"]],[["Missing the information I need","missingTheInformationINeed","thumb-down"],["Too complicated / too many steps","tooComplicatedTooManySteps","thumb-down"],["Out of date","outOfDate","thumb-down"],["Samples / code issue","samplesCodeIssue","thumb-down"],["Other","otherDown","thumb-down"]],["Last updated 2024-02-13 UTC."],[[["DayPart objects specify a time period within a week, utilizing DayOfWeek, StartTime, and EndTime to define the targeted timeframe."],["These objects are primarily used within Ad Manager services to manage and target ad delivery during specific time slots."],["DayOfWeek is an enumeration ranging from Monday to Sunday, offering flexibility in selecting specific days."],["StartTime and EndTime utilize the TimeOfDay type, enabling precise configuration of the beginning and end of the targeted time period."],["DayPart objects are a fundamental component in scheduling and optimizing ad delivery within the Ad Manager system, allowing for refined control over campaign timing."]]],[]]